Super Heavy booster
Booster 21
Launch
- Type
- Booster
- Block
- Block 3
- Current stage
- Launch
- Location
- TBD
- Facing
- IFT-14 candidate
- Milestones
- 9
Production timeline
- Launch28 SEP '26Flight 14 launched from Starbase Pad 2; B21 splashed down in Gulf with two engines out, then FTS-terminated.
- Ready to Launch21 SEP '26Booster 21 rolled to launch pad for wet dress rehearsal and Flight 14 launch prep; Flight 14 postponed to September 28.
- Ready to Launch21 SEP '26Booster 21 rolled from Mega Bay 1 to Pad B, Starbase; now awaiting stacking with Ship 41. 3 cryo tests and 1 static fire complete. Flight 14 NET Sept 28.
- Static Fire28 AUG '26STATIC FIRE Starship Booster 21 performed what looked like a 14 second multi engine static fire test ahead of flight 14
- Engine Install24 AUG '26B21 engine installation complete (all engines installed); now awaiting rollout to pad NET Aug 25 for Flight Test 14.
- Cryo Proof21 JUL '26Following two partial tests in the previous days, Starship Booster 21 (flight 14) completed a full tanking cyro test, with the booster fully frosty
- Stacking29 JUN '26Booster 21 forward section F:11 stacked atop aft A:25 on 28-29 Jun, completing the stack.
- Stacking25 JUN '26Booster 21 forward section (F3:4) moved into Mega Bay 1 for stacking.
- Stacking14 JUN '26Booster 21 undergoing stacking in Mega Bay 1 ahead of Flight Test 14 (with Ship 41).